|
Mission Description
Low power SEP Insertion Trajectory into a Quasi-Periodic Orbit at the Exterior Libration Point of the Sun-Earth/Moon System. Model includes only the gravity of the Earth, Moon, and Sun and these follow a realistic ephemeris.
- Departure date Dec 1 2010 <= T0 <= Jan 31 2011
- Initial Orbit LEO 200 KM altitude
- Inclination Free
- Ascending Node Free
- Argument of Periapsis Free
- Total Transfer Time Free
- Injection Free departure; V_infinity magnitude and direction free
- Initial Mass not tied to a Launch Vehicle; initial mass after injection maneuver is 2500 kg.
- Power P0 = 1 kW, Psc = 0 kW.
- Thrust Magnitude :09 N ≤ T ≤ 0:11 N
- Engine Degradation None
- Coast Periods allowed if optimal
- Target Orbit L2 Halo or Lissajous with z-axis amplitude ≤ 200K km, y-axis amplitude ≤ 500K
- Arrival Date ≤ May 1 2011
- Final Mass Maximize
- Originally modeled using Copernicus
Additional Mission Options
A. Sun-Earth Libration Point Orbits to other Sun-Earth Libration Point Orbits
Input/Output files
Copernicus20060313.zip (download)
Mystic9_0_0.zip (download)
All Reference Case 29: Earth-Sun libration point mission(s) Files (download zip)
|